Decision engine guide - EQOS Asia

How to pilot a decision engine on one decision in 30 days

Summarise this page with AI

The essentials in 30 seconds

  • Pilot a decision engine in 30 days by choosing one real decision and moving through four weeks: frame, collect, analyse, debrief.
  • The EQOS Asia standard workflow runs from NDA and scoping in 1 day to analysis in 3 to 10 days (EQOS Asia method page, as of October 2026).
  • A Study delivers all three pillars in 5-7 days.
  • The pilot ends with a score, a recommendation, and a 30/60/90 day action plan.
  • A free 30-minute pre-diagnostic starts the first week.

A pilot proves a decision engine on your own ground. Pick one decision, set the success test in advance, and run four weeks from the first call to the debrief. This guide is part of the series on how to choose a decision engine, and it builds the plan from the published timings of the EQOS Asia workflow, so every step can be checked against the source pages.

Why pilot a decision engine on a single decision?

A single decision keeps the pilot small enough to finish and large enough to matter. Everyone can judge the result against a real choice with a real deadline, and the team learns the full cycle: briefing, data, score, debrief. A pilot spread over many decisions would take longer and make the comparison with your own judgment harder. The same plan can be repeated for the next decision with fewer surprises.

Define success before the work starts. A good test reads like this: one score, one recommendation, one next action, and a record of the effort. If the pilot delivers those four things inside 30 days, the engine has earned a second decision.

Write the success test as a short list of criteria, each with a measure, a target and an owner. 3 groups cover most pilots: measurable, quality and adoption criteria. The page on pilot project success criteria shows thresholds and an illustrative scorecard that turns the debrief into a clear go or no-go.

Four weeks of a decision engine pilot: frame, collect, analyse, debrief and decide
A pilot in four weeks, from the first call to the decision.

Which decision is the right one for a 30-day pilot?

Choose a decision with a deadline, an owner, and facts that can be gathered within a week. Typical candidates in the EQOS Asia pricing examples include whether to sign a contract, whether to partner up, whether to hire a key executive, and whether an investment is viable (EQOS Asia pricing page, as of October 2026). Pick the one your team already debates in meetings, because the pilot then answers a live question.

Favour decisions that are still open, and especially those where a wrong call would be costly enough to justify an hour of preparation. Write the question in one sentence and name the executive who owns the final call. That executive attends the first call and the debrief.

A short proof of concept can come first when the team wants to test one narrow claim before a live decision. It uses a past case with a known outcome, a written success test and exit rules. The page on a proof of concept for a decision engine sets out each of the 3 parts and the tiers that fit.

What happens in the first week of a decision engine pilot?

Week one frames the pilot. You send a short description of the situation, with the countries and currencies involved, and EQOS Asia replies within 24 hours on business days with a 30-minute video slot in Singapore time (SGT, UTC+8) (EQOS Asia contact page, as of October 2026). The call identifies the right tier for the question.

The standard workflow then opens with the NDA and scoping, in 1 day, including an initial briefing of 60 to 90 minutes by video (EQOS Asia method page, as of October 2026). By the end of the week, the scope, the data list, and the date of the debrief are written down and agreed by both sides. Share the written scope with everyone who will attend the debrief.

How does the pilot collect the decision inputs in the second week?

Week two gathers the facts. The structured collection takes 2 to 5 days and covers internal documents, targeted interviews, and existing data, in an encrypted, isolated environment (EQOS Asia method page, as of October 2026). Any format is accepted, digital or physical, so the team can send what it holds today.

Assign one person to answer questions from the provider and keep a list of open items. Label each fact with its source and date. A quick reply to each question protects the schedule, because the analysis can start as soon as the collection closes. Short daily check-ins of ten minutes keep the collection on schedule.

What does the decision engine deliver in the third week of the pilot?

Week three is the computation. The EQOS Asia analysis runs for 3 to 10 days: the Codex Universalis core computes the φ(S) score, models the tensions, and projects scenarios (EQOS Asia method page, as of October 2026). A Study at US$1,369 delivers audit, modelling, and prediction in 5-7 days, with an interactive HTML deliverable and a 30/60/90 day action plan.

A Decision at US$910 models one structural choice in 48-72 hours and fits a pilot with a tighter calendar (EQOS Asia pricing page, as of October 2026). Whichever tier you select, ask for the deliverable format in advance, and plan the debrief while the analysis runs.

Published durations of the EQOS Asia standard workflow: framing, collection, analysis and debrief, with the output of each phase
Published durations of the EQOS Asia workflow (EQOS Asia method page, as of October 2026).

How do you read the score and decide in the last week of the pilot?

The last week turns the score into a choice. The deliverable lists immediate decisions, deferrable decisions, and a recommended sequence. A φ(S) score below 0.618 falls in the STOP zone and a score above it falls in the OK zone, with the 3 priority risks named (EQOS Asia method page, as of October 2026).

Compare the result with your own judgment from the start of the pilot. Where they agree, the engine gives that call a documented basis. Where they differ, the gap shows which fact or assumption to review. The executive keeps the final call, and the debrief records the reasons for it. Write the decision and its reasons in two lines, and share them with the team.

What can follow a 30-day decision engine pilot?

Three paths open after the debrief. You can apply the engine to the next decision, move to a deeper tier such as the Diagnostic at US$2,288 over 2 weeks, or keep the model current with Sentinel, which re-measures the 9 dimensions monthly and carries a 6-month minimum commitment (EQOS Asia pricing page, as of October 2026).

Review the pilot against the success test you wrote in week one: score, recommendation, next action, effort. The pricing page lists the next tiers, and the free 30-minute pre-diagnostic starts the first week of a new pilot. Each next step starts from the record of the pilot.

Frequently asked questions

Can a decision engine pilot really fit in 30 days?

Yes, on one decision. The published EQOS Asia durations add up to 1 day of framing, 2 to 5 days of collection, and 3 to 10 days of analysis, followed by the debrief (EQOS Asia method page, as of October 2026). The rest of the month absorbs replies, scheduling, and the decision itself.

Which tier suits a 30-day pilot?

A Decision at US$910, delivered in 48-72 hours, or a Study at US$1,369, delivered in 5-7 days, both fit inside 30 days (EQOS Asia pricing page, as of October 2026). The Study is the first level that activates audit, modelling, and prediction together.

Who should attend the debrief?

The executive who owns the final call, the person who gathered the data, and one colleague who can challenge the assumptions. The EQOS Asia Diagnostic includes a 60-minute video debrief, and higher tiers add a Comex presentation in person or by video (EQOS Asia pricing page, as of October 2026).

What if the result differs from my first instinct?

The gap is useful. Open the inputs, check the weights, and replay the computation to see which fact drives the difference. The EQOS Asia pricing page states that the verdict is fair whether or not it matches your first instinct, and the executive keeps the final call.

Test your knowledge

1. How many decisions should a pilot cover?

  • Five
  • One
  • Twenty
Show the answer

One.

2. How long does the structured collection take in the EQOS Asia workflow?

  • 2 to 5 days
  • 3 to 10 days
  • 6 to 8 weeks
Show the answer

2 to 5 days.

3. Which tier delivers audit, modelling, and prediction in 5-7 days?

  • Reading
  • Decision
  • Study
Show the answer

Study.

4. Who keeps the final call after the debrief?

  • The provider
  • The executive
  • The software
Show the answer

The executive.

5. What is the minimum commitment for Sentinel follow-up?

  • 1 month
  • 3 months
  • 6 months
Show the answer

6 months.

About the author

Portrait of Stéphane Jambu

Stéphane Jambu

President, EQOS Forecast Asia

Stéphane Jambu leads EQOS Forecast Asia and works as a consultant in e-commerce, search visibility, and AI. LinkedIn profile

Sources: EQOS Asia method page (eqos-asia.com/method.html), pricing page (eqos-asia.com/pricing.html) and contact page (eqos-asia.com/contact.html), consulted on 21 October 2026. Page updated on 21 October 2026.